Execution Project Engineer
Sarawak - MIRI
Sarawak - MIRI
Responsibilities:
In
general the Execution Project Engineer for the IR Project Team shall be
expected to carry out as a minimum the following duties:-
Project Management
Project Management
· IR Project execution focal point for the respective facilities/campaign(s).
· Ensure Design PE issue AFC package four (4) months before the campaign.
· Issue AFC package to Execution Parties (ECS3 or MESK/MESB/Operation) for execution.
· Provide execution budget phasing, Value of Work Done, Latest Estimate to the Project Engineering Team Leader.
Engineering
· Provide constructability review and input during design development phase, as appropriate.
· Ensure Vendor assistance, if required, is specified up-front in the Technical Requisition Package.
· Establish
project execution strategy during VAR1 review or design phase for
his/her respective campaign(s) to be incorporated into the Integrated
Activities Plan (IAP). Ensure the execution strategies are discussed and
formalized with SSB Execution Parties.
· Ensure
construction isolation and reinstatement material (items not provided
by CAT3 contractors only) are included by engineering group as part of
the design MTO issuing for procurement. Engineering to provide draft isolation plan with marked up P&IDs for review and input by EPE before IFR.
Planning Scheduling
· Review
IAP for all the projects in his/her respective campaign(s) and
confirming the project schedules are realistic and achievable.
· Ensure
his/her respective campaign(s) are being planned, booked and optimized
within SSB Integrated Barge Schedule (IBS) by the IR Planner.
· Provide
execution progress input for all the projects in his/her respective
campaign(s) to the IR Planner to be updated on the EPCM Readiness Report
and IAP.
· Review
fortnightly progress report issue by planning group. Ensure his / her
project(s) key issues and concerns are timely addressed. Develop project
specific recovery plan, if required to mitigate schedule slippage.
· Explore potential opportunities to accelerate/advance future planned projects to maximize execution delivery.
Cost Control
· Provide
comments and challenge the IFC work-pack packages prepared by CAT 3
contractors with regards to man-hours estimated, resources, durations
and shutdown requirements.
· Ensure
Purchase Order Proposal (POP) for execution is reviewed, challenged and
issued to the CAT3 contractors prior to prefabrication and campaign
commencement.
Procurement Support
· Ensure
Design PE is driving the procurement activities for all the projects in
his/her campaign(s) to achieve placement of PRs and POs in SAP to
schedule. Conduct material readiness meeting with DPE and Procurement group.
· Ensure Design PE is driving Technical Bid Evaluation (TBE) as per plan.
· Liaise with Design PE (NDCR)
and Procurement to ensure that all relevant Vendor documentations
(drawings, certificates, operating and maintenance manual, etc) are
delivered prior to execution.
· Liaise
with IR Procurement department to ensure all PO issued project
materials are ordered, expedited and delivered at least one (1) month
prior to the prefabrication or execution/campaign.
· Coordinate with ECS3 group on the procurement of cost plus material.
HSSE/QA/QC
· Ensure QC data packages prepared by the CAT 3 contractors are reviewed by IR QA/QC Advisor for completeness.
· Liaise with Design PE and IR QA/QC Advisor to ensure Vendor packages meeting the Inspection and Test Plan (ITP) requirements.
· In
managing HSSE, coordinate the preparation of SIMOPS/SSP document for
his/her campaign(s). Provide details execution scope of work &
planning information for the preparation of SIMOPS/SSP document to the
document author/originator. Ensure SIMOP/SSP document is approved per
plan.
· Participate or coordinate IPOP, HAZID & MOPO sessions.
Execution Management
· Prepare material load out list to be issued to Warehouse supervisor for load out to site.
· Track
and liaise with IR Procurement and Warehouse Matco to ensure materials
delivery for onshore prefabrication and offshore work are as per plan.
· Ensure ECS2 is involved right from design development phase for project that required commissioning. Provide
support to the commissioning team headed by ECS2, who is responsible
for the setting up of the commissioning team, development of
commissioning plan, adopting the right commissioning strategy and
preparing commissioning and start-up procedures.
· Liaise
with ECS3 Campaign Leader, CSR and ECS2 to monitor offshore work
progress and provide expeditious response to Site Technical Query (STQ).
If design input is required, coordinate the response via Design PE.
· Depending on the operational needs, the Execution PE may be required to be on site to provide technical support.
· Engage and coordinate with IR NDCR (either via IR direct contract or existing SSB contract) the mobilization of the relevant vendors to support the offshore work.
· Ensure all relevant documentations are delivered to ECS2 for site commissioning team and the operation.
· Monitor
weekly fabrication report and offshore daily progress report issued by
Cat 3 contractors to ensure project timely completion. Addressed any
issues and concerns raised by site.
· Coordinate with ECS2 on the progress of the pre-commissioning and commissioning activities.
· Ensure all surplus materials are returned to Labuan warehouse upon completion of campaign.
· Upon
completion of offshore work, obtain red-line mark-up drawings from ECS3
Campaign Leader and handover to Design PE for as-builting.
Project Closed Out
· Capture lesson learnt and share with the team.
· Provide final documentation to Design PE for project Close Out.
Requirements:
Applicant
must possess a recognized Degree in an Engineering Discipline with a
minimum of 7 years of practical experience in design, fabrication and
construction in heavy industry process engineering or a related
industry. Applicant must have at least 5 years in the onshore and
offshore oil and gas industry with 2 years in a Project Engineering
role. The applicant shall be expected to carry out duties from Project
Management, engineering, planning scheduling, cost control, procurement
support, HSSE and Execution management of the project.
Interested candidates are required to apply online to our Worley website https://worleyparsons-au.hua.hrsmart.com/ats/job_search.php and search for location Req. # 17537 - Location Miri.
closing date 17th February 2012
No comments:
Post a Comment